二級海技士(航海)筆記問題(英語):その46
以下は,二級海技士(航海)の筆記試験における,法規に関する過去問題です。
※ 出題は,平成18年7月から平成26年4月定期試験までの問題を調べたものです。「平成/年」を数字で示しております。
問題
次の英文を日本語になおせ。
Loading, unloading and stowage of solid bulk cargoes
(a) The master and terminal representative shall ensure that loading and unloading operations are conducted in accordance with the agreed plan.
(b) If during loading or unloading any of the limits of the ship referred to in paragraph 2 are exceeded or are likely to become so if the loading or unloading continues, the master has the right to suspend operation and the obligation to notify accordingly the appropriate authority of the port State, with which the plan has been lodged.
(c) The master shall ensure that ship’s personnel continuously monitor cargo operations. Where possible, the ship’s draught shall be checked regularly during loading or unloading to confirm the tonnage figures supplied. Each draught and tonnage observation shall be recorded in a cargo log-book. If significant deviations from the agreed plan are detected, cargo or ballast operations or both shall be adjusted to ensure that the deviations are corrected.
(注)the port state:寄港国
【出題:25/02】